Contract manufacturing for approval holders · ATA 25 & ATA 32
Start an enquiry

Release path determination

Will this part actually be installable on your aircraft?

Four inputs. Three lines back, in writing. It costs nothing, it takes one exchange, and it is the only question worth settling before anyone talks about price.

The determination may be negative. That is the point.

What goes in, what comes out

No forms to fill in twice. The four inputs are the four things that change the answer.

Inputs
Part numberThe number you intend to buy or build.
Aircraft typeThe type the part will be fitted to, not the fleet’s generic family.
State of RegistryWhere the aircraft is registered, which decides which authority’s acceptance counts.
Approval you holdPMA, POA, TSOA, TC/STC, a national approval, or none yet.
Outputs
InstallableYES NO CONDITIONAL
Approval basisWhose approval the part hangs on — yours, or a named manufacturing partner’s.
Release documentThe tag or certificate that travels with the part, and who signs it.

A conditional answer always states the condition. “Conditional” without a stated condition is the same as no answer, and we do not issue those.

How the answer is reached

Four things decide it, and none of them is the price of the part.

StepWhat we checkWhy it decides
1What the part is approved againstA PMA, a POA, a TSOA and a TC/STC are not interchangeable. The basis decides what may be claimed.
2Which release document that basis can produceAn approval normally maps to one document family: 8130-3, Form 1, an airworthiness approval tag, or a certificate of conformity where the receiving authority allows it.
3Whether the receiving authority accepts that documentAcceptance is a matter for the importing authority. Bilateral arrangements cover some document pairs and some part categories, not all of them.
4Whether the installation itself is coveredThe part can be airworthy and still not fit the approved design without an STC, a modification approval or the TC holder’s consent.

We re-check the acceptance position at the time of each enquiry. It is not a standing statement and it is not a legal opinion. The finding on the aircraft stays with the authority of the State of Registry and with the design approval holder.

Three determinations, as issued

Details removed, structure kept. The second one is the reason this page exists.

Example 1 — yes

YES

SituationPart built to the holder’s own FAA PMA; aircraft on the US register
Approval basisHolder’s PMA
Release documentFAA 8130-3, issued by the holder
DeterminationInstallable as a direct replacement, subject to the operator’s maintenance programme.

Example 2 — no

NO

SituationPart to be built under a partner’s CAAC approval; aircraft on an EU member state register
Approval basisPartner’s CAAC approval, no EASA approval covering the part
Release documentCAAC airworthiness approval tag
DeterminationNot installable as a direct replacement on that register. An EASA approval, an STC or an approved modification would have to exist first.

Example 3 — conditional

CONDITIONAL

SituationPart built under the holder’s EASA POA; operator in a registry that accepts a Form 1 with a POA statement
Approval basisHolder’s POA
Release documentEASA Form 1 plus the POA holder’s statement
DeterminationInstallable if the receiving authority accepts that document set for this part category and the operator’s approved maintenance data covers the fit.

Request a determination

One part number is enough to start. A list is fine too — attach it and we will work through it.

Who you are
What you want determined

One per line. If the list is long, attach it below instead.

Attachment

CSV, XLSX, PDF or TXT, up to 5 MB. Drawings and specifications are covered by the NDA you sign before transfer — send nothing you are not authorised to share.

We answer in writing within two working days. A determination can come back negative — that is the point of asking.

We are the only partner in this chain who tells you before you order which document your part will carry, and whether your registration will accept it.

Every trader can move a box. The expensive mistakes in this business happen in the two weeks after the box lands, when somebody discovers the tag is the wrong one for that register. One written determination removes that risk from the programme.

Send the four inputs