Contract manufacturing for approval holders · ATA 25 & ATA 32
Start an enquiry

Part family 01

Seat components, from the frame down to the bushing

The parts passengers never see and always feel. Seat work rewards process control more than machining skill: the tolerance that matters is usually the one in the assembly, not on the drawing.

What we make

Seven groups. If a part sits outside them and still belongs to a seat, it is worth asking — the answer may be a referral rather than a quotation.

Part groupTypical materialProcessWhat decides acceptance
Seat frames and legsAl 6061-T6, 2024-T3, 4130Tube bending, TIG welding, machiningWeld procedure qualified; distortion controlled after welding
Seat pansAl sheet, glass/epoxyForming, lay-up, edge finishingStiffness against the drawing, weight tracked per unit
Armrest assembliesAl, PC, PEI, upholstery interface partsMachining, moulding, assemblyPivot wear and latch effort decide perceived quality
Tray table hardwareAl, POM, PEIMachining, injection mouldingCycle life and rattle are the acceptance points
Recline and track fittings15-5PH, Al 7075Machining, heat treat coordinationWear surfaces and load path per the drawing
Bushings, spacers, wear padsPOM, PA66-GF30, bronzeTurning, mouldingClearance stack-up across the assembly matters more than the single part
Literature pockets, bezels, coversGlass/epoxy, PC, PEILay-up, thermoforming, mouldingFST callout and edge finish

Where the difficulty actually sits

Three things that decide whether a seat programme runs quietly or becomes a series of concessions.

The load path belongs to your design

A seat frame is certificated as part of the seat assembly. We do not change a section, a weld or a material without a written change from you, because the substantiation that made it airworthy is yours.

Interchangeability is a stack-up problem

Seat parts get moved between shipsets in service. A part that is inside its own tolerance can still fail to fit when the mating parts sit at opposite ends of theirs, so interface control is agreed at NPI.

Wear is the real service life

Bushings and latch surfaces decide whether an armrest still feels right after five years. Material and surface treatment are chosen for cycles, not for the first article.

What you send, what comes back

No programme starts without the left column. Nothing ships without the right one.

From you

  • Drawing and revision, with the seat model or shipset it belongs to
  • Material and finish callouts, including touch surfaces
  • Acceptance test or load case, if the drawing references one
  • The approval the part will be released under

From us

  • Parts to the revision actually issued
  • First article inspection report in AS9102 format
  • Material certificates with heat and lot traceability
  • Process traveller and certificate of conformity

What moves the price

Published because it makes the quotation easier to challenge — and because a price with no visible driver is a price nobody can negotiate.

DriverEffect
Tooling and fixturesOne-off, but it sets the achievable cycle time for the whole programme
Stock size and alloyA part machined from the next stock size up can cost a third more in material alone
Surface finishAnodise and paint add handling, masking and rework risk on visible surfaces
InspectionCMM on critical features is quoted per feature, not per part
Batch sizeSet-up is amortised across the batch; the first article never is
SerialisationMarking and recording per unit is a process step, not a label

Send the drawing status for one seat part

Released drawing, a draft, or a sample with no drawing at all — each one leads to a different next step, and we will name which one applies.