Contract manufacturing for approval holders · ATA 25 & ATA 32
Start an enquiry

Programme case notes

Two anonymised build programmes, and what they actually prove

A case note on a contract manufacturing site has a narrow job: show where the work stopped, which records changed hands at that point, and who closed the file with a signature. It is not a customer list, a catalogue, or a claim about how many parts moved.

Why no names appear here. The approval holder, the aircraft programme, the qualified facility, part numbers and batch quantities are withheld in both notes. Publishing them would describe somebody else’s supply chain rather than our side of the work. What remains is the part a prospective holder can actually reuse: the shape of the brief, the handover boundary and the document set.

Case note 01 · ATA 32

A handover point named in the brief

A holder with its own downstream operations asked for carbon discs at one defined process stage, together with the metallic items used at the next operation. The interesting part was the document set at that exact boundary.

Read the stage-handover note →

Case note 02 · ATA 25 + ATA 32

Two families kept on one routing

Cabin interior details and wheel and brake components were requested in the same programme. The processes sat in different workshops; the revision state, the first article plan and the traceability file did not.

Read the two-family note →

Next step

Put your own brief in writing

A programme starts with a drawing status, a part family, the stage or operations you will keep, and the registry you intend to sell into. The first written reply sets out the route and the records.

Start an enquiry →

How to read these notes

The withheld column is not an omission. It is the same boundary the site applies everywhere else.

Published, and deliberately withheld
ItemPosition
PublishedThe shape of the brief, the handover boundary, which records changed hands, who performed the remaining operations, and who signed the release.
Approval holder, aircraft programme and facility identityWithheld. Naming them would describe somebody else’s supply chain, not the manufacturing discipline on this site.
Part numbers, quantities and pricesWithheld. There is no catalogue, no published part count and no stock position behind these notes.
Process parametersWithheld. Numerical density values, treatment chemistry, thermal profiles, rivet and fixture settings and batch process cards stay with the qualified facility and the technical agreement.
Release documentsNot reproduced. A release document is issued under an approval by the holder of that approval; these notes describe records that support a signature, never a substitute for one.

What a case note cannot decide for you

A programme that worked for one holder under one registry is not evidence that the same route works for yours.

  • Whether the same boundary would work for your registry — that is a written release path determination, not a case note.
  • Whether the approval basis is the same for every family in your programme; a cabin trim item and a brake component are not judged in the same way.
  • Whether the document set is agreed before the first article is cut, because that is when a missing record is still cheap to add.
  • Whether the output you intend to buy is a finished part or work in progress at an intermediate stage. The two travel with different paperwork.

Records are not approvals. A certificate of conformity, a first article report and a signed process traveller describe what was made and checked. None of them is an airworthiness release document, and none of them is issued under an approval we hold. Seehow the records are produced and kept before you plan your own file.

Tell us where your programme should stop