Contract manufacturing for approval holders · ATA 25 & ATA 32
Start an enquiry

How we work

From first enquiry to a released shipment

Six steps, in this order. The order is the point: the release path is settled before the price, and the price before the tooling.

The sequence

Each step ends with a document. If a step ends with a phone call, it has not ended.

  1. 01 · Enquiry and determination

    You send the part family, the drawing status, the approval you hold and the State of Registry. Before anyone discusses price, the release path is settled in writing — because a part that cannot be installed has no commercial value to discuss.

    Written reply within two working days

  2. 02 · Feasibility and routing

    Process selection, make-or-buy on sub-tiers, fixture concept, inspection concept. Where the part is outside the process families we run, this is where we say so.

    Output: routing sketch, risk list, indication of tooling need

  3. 03 · Quotation

    Project work and production are quoted separately: NPI, tooling, first article, and then unit price at stated quantities. Anything excluded is listed as excluded, not left to be discovered later.

    Output: quotation with assumptions and exclusions written out

  4. 04 · Agreement and NDA

    Confidentiality first, then the manufacturing and quality agreements. Drawing and tooling ownership, change control, audit rights and defect demarcation are settled here — before data moves.

    Output: signed agreements, data transfer schedule

  5. 05 · First article

    Tooling, process trials, then a full first article in AS9102 format. Production does not begin until you approve it in writing.

    Output: FAI report and ballooned drawing, approved by your quality function

  6. 06 · Production and release

    Batch production against the approved process, with records per shipment. You release the parts under your approval; we ship against your purchase order.

    Output: parts, record set, certificate of conformity

How the fee is structured

Not a markup on parts. That distinction decides what we are willing to tell you.

ElementCoversHow it is charged
Project workNPI, tooling, fixtures, first article, release supportCharged as work, at a stated scope
ProductionUnit price at stated quantitiesCharged per unit, with the batch economics visible
Sub-tier workHeat treat, surface finishing, testingPassed through with the supplier’s document, not marked up silently

Because the project work is charged as work, we can tell you when a part is not worth building. A supplier earning a percentage on every unit has no reason to say that, and usually does not.

It also means the quotation has a shape you can argue with: scope, hours, tooling, first article, unit price. If a line looks wrong, it can be challenged on its own.

Your data, your tooling, your customer

Four commitments. They are in the agreement, and they are the four things holders actually worry about.

Confidentiality before data

A mutual NDA is signed before drawings, samples or specifications move. It covers the data itself, the fact that an enquiry exists, and the identity of the end customer where you tell us in confidence.

Drawings and tooling are yours

Anything you supply stays yours. Anything built specifically for your part is your property, listed in a schedule, marked as yours, and returnable at the end of the term.

No parallel quoting on your part number

We do not take your part number to another customer, and we do not quote it to a third party. If somebody approaches us with your number, we tell you.

No direct approach after registration

Once you register a customer or a programme with us, the manufacturing partner does not approach that customer directly for twelve to twenty-four months, as set out in the agreement.

What we will not promise

Three refusals, all of which make the rest of the offer worth something.

We will notBecause
Promise a delivery date before the first article plan existsProcess, tooling and inspection set the date. Any earlier number is invented.
Promise that a part is installable without checking the registryAcceptance is a matter for the importing authority, not for the manufacturer.
Give a verbal answer and confirm it later in writingIf it is not written, it will be remembered differently by both sides within a month.

Start at step one

The first reply is the product

Send four items — part family, drawing status, approval held, State of Registry — and judge us on what comes back within two working days.